Main stages of repair in the apartment

Main stages of repair in the apartment.

How to begin repair of the apartment?

The very first stage of the repair work of old houses is the damage and taking apart first of all of the shabby walls and partition walls, getting rid of the wall and ceiling covering. This phase is one of the most "filthy" stages of the repair work.

One more among the most crucial and "dusty" works is the window block replacement. It is necessary to do this first of all due to the fact that dirt and dust will be unallowable during following stages and it is forbidden at all to open windows throughout painting and wallpaper works (big drops of the temperature and wetness are unallowable). After installing windows and windowsills it is required to load them instantly in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to prevent scratches).

The following phase is wiring. Electrical wiring can be installed in walls or along the floor. Circuitry is made inside the pipes to make sure electrical security and increase reliability. The pipe safeguards circuitry from external damages and allows to replace the wire totally without breaking walls and floor merely by placing the new wire instead of the old one.

House Painting follows the wiring. The regular error during the simultaneous conducting of such works takes place when workers forget to set out one of the cables and house painters have already plastered and ravelled the wall. As a result, additional works https://www.fixitrightplumbing.com.au/plumber-botanic-ridge/ are necessary to seal goes after on the ended up wall. The places of the feed switch and wall outlet place and their number need to be thought-out beforehand. The plan of power electrical wiring is normally included into the style project.

Later on the system must be prepared to service in case of failures. In addition to the electrical wirings, the telephone cable television and the television cable are set out. The power cable must not be set out near the telephone and antenna cables to prevent sound pickup and disturbance. The most strange moment is laying out the TV cable. In order to make 2 (or three) TV sets in the home the second cable television is typically just "firmly soldered" in parallel, so the cable resistance is reduced. As an outcome, the display quality is degraded, many programs can't be received and etc. In order to avoid such situation it is necessary to welcome an expert with unique equipment. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-lasting process, that is why it is conducted simultaneously in all properties, if it is possible. Hold-ups are related to the technology. Each applied layer of the plaster (or filling out finishing) should dry completely before the work will continue.

Works in sanitary arrangements and the kitchen start simultaneously with house painting. It is better to meet so-called "unclean" operate in the top place and at the same time. In accordance with the strategy of the hygienic service technician area welding, wall chasing and pipeline run are performed. Steam radiator admissions are prepared, taps and brackets are mounted, but radiators are not installed.

Then works in sanitary plans are carried out according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below phase is assembling ceiling and laying tiles on the floor. And at last other sanitary gadgets, mixers and accessories are mounted.

After electrical wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of electrical wiring are insulated and set out into rosette plates. Sockets and breakers are not set up throughout this phase in order to conserve their surface look. The finish puttying of walls is performed simultaneously. The technically precise control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that determines wetness of the material.

image

The following phase is the procedure of fill. Fill can be made with various products-- from normal masonry cement-sand mix to self-aligning floors. The benefit of the basic mix is its cheapness, the drawback is that such mixture is much harder lined up at the level and the final dry time of such fill is 40 days, just then the next phase of the work with flooring can be carried out, i.e. the duration is too long. Self-leveling self-aligning floorings are a lot more pricey, however more technological. Aligning happens nearly "instantly" i.e. fluid option of mixture is poured out, then it runs and you receive the horizontal surface area. The last dry time is 15 days i.e. you have considerable time economy. The system "warm floor" is set up into the fill. If the so-called "wet procedures" are inapplicable the technology of the dry aligning (the fill innovation) is used bases for floorings with adjustable floor battens are mounted.

After fill door boxes and door are installed. Installation of doors must take into the account thickness of future flooring covering. After setup the door can be removed its hinges and eliminated till the end of repair or loaded into polyethylene film to secure from damages. At the same plumber time ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile should be laid on the definitely dry overlay.

Finishing of the flooring installing depends upon the planned covering. In many cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to provide the close fixing of plywood and long-term service of the floor without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After mounting of the plywood is ended up, wallpaper for painting can be pasted on walls.

In facilities where surface covering of the flooring is laminated flooring or parquet stockpile, the normal wallpapers are pasted (not for painting) in the very first place. Then the floor covering is mounted.

If finish covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The pointed out consequence is linked only with such scrambling procedure when the fantastic quantity of dust is produced. In spite of the truth that good flooring grinders are equipped with the vacuum, the sufficient quantity of dust is precipitated on surrounding subjects consisting of walls. Dust is extremely acerbic and is terribly cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not take in the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be considered to be ended up. It is left just to install the plinths, decorative components, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is essential to note that the series of works was noted in basic and can change depending upon the definite situation-- the variety of rooms in facility, your resources, peculiarities of the construction of the multilevel properties. It is based on common sense and every person efficient in analysis can separately produce such a series.